Is it really possible to carry out exterior wall coating application in winter when the temperature is low?

Winter is the most difficult and prone to problems season for coating application. Generally, the ambient temperature should be controlled above 5 degrees, and the ambient humidity should be controlled below 80%, otherwise it is unsuitable for application. However, some projects still need to proceed with application due to schedule requirements. To ensure the application quality and coating performance, the following should be paid attention to during the application period:

Base treatment

Base layer treatment is the foundation of exterior wall coating. The quality of base layer treatment directly affects the adhesion, decorative properties, and service life of the coating. Qualified base layers have five fundamental characteristics: firm, flat, dry, neutral, and clean.

The content of base layer treatment includes: removing dust, oil stains, asphalt, and other contaminants from the surface of the base layer; reducing or eliminating surface defects; improving the physical or chemical properties of the base layer surface. During winter construction, when the moisture content of the substrate is too high and the temperature is too low, the curing period should be extended to ensure the moisture content of the base layer is below 10% and the pH value is within 10, making it qualified.

Putty Layer Construction

Putty layer construction can only proceed on the basis of a qualified base layer. When the temperature is relatively low during winter days, try to perform construction on walls with sunlight exposure. For shaded walls, ensure the minimum nighttime temperature is above zero degrees Celsius; otherwise, construction is not allowed. Once the putty layer is frozen, after warming up, a large amount of moisture in the putty will evaporate, causing structural loosening, internal stress accumulation, and ultimately leading to putty blistering, cracking, and peeling. To reduce the drying time of the putty layer, the putty should not be applied too thickly, and each coat should be applied only after the previous coat has dried completely. Generally, 2-3 coats are sufficient. Finally, the putty must be completely dry before sanding to prevent sandpaper adhesion and ensure surface flatness control.

Exterior Wall Coating Construction

Exterior wall coating construction is generally divided into three steps, taking natural stone coating as an example. First, apply an exterior anti-alkali primer to reinforce the base layer, seal against alkali, and enhance the adhesion of the topcoat. Each coat of primer must ensure complete drying, with the finger pressing test showing no residue, and a milky sheen visible when tilting the wall, before proceeding to apply the topcoat.

Next is the construction of the main coating, natural stone coating. Since natural stone coating is a thick-paste water-based coating, its drying performance deteriorates when the temperature is low and humidity is high in winter, making coating difficult. Moreover, the emulsion is prone to freeze and break down during the drying and film-forming process, losing its bonding and film-forming functions, leading to problems such as coating powdering. Therefore, when the natural environmental temperature is between 5-10°C, try to perform construction on walls with sunlight exposure. For shaded walls, take measures to shield them to prevent cold winds from lowering the wall temperature. Construction should be carried out between 9:00 AM and 4:00 PM daily. Construction is not allowed on rainy, snowy, or foggy days. Otherwise, it will severely affect the coating performance.