Cracking 2,
Water-resistant and moisture-proof
Good scraping application
10% pH value must be less than 10. New cement wall
N. 2. Curing time
N. 3. Must reach 28 days
N. 4. (Winter) or
N. 5. 14 days (
N. 6. Summer).
Cracks, panels
Joints should be filled solidly
N. 9. and add mesh tape, apply putty after drying.
N. 10. Should be at 5℃ or above
N. 1. The thickness of each putty application should not exceed
1mm。
N. 2. Should not be exposed to rainwater
N. 3. Abrasion. Curing
N. 4. 5-7 days later, proceed
N. 5. Coatings application.
2-3 kg/m
N. 6. 2. Seven,
N. 7. Store at the location.
N. 8. Should be stored sealed
N. 9. Putty that has been mixed with water should be used within
N. 10. Used up within 2 hours.
Warranty period 12 months
N. 10. Execution Standards
JG/T157-2009
GB24408-2009