Waterborne Coatings · Air Purification · Advanced Nanomaterials
HOTLINE 400-880-0351
Home / /Architectural Coatings /Sand-in-Water Multi-Color Coating
PRODUCT DETAIL

Sand-in-Water Multi-Color Coating

High stone realism · Good crack resistance · Good water resistance · Good color retention

Sand-in-Water Multi-Color Coating NO. 1388
Architectural Coatings / Exterior Stone & Texture

Sand-in-Water Multi-Color Coating

25KG / pail High stone realismGood crack resistanceGood water resistanceGood color retention

Modern Sand-in-Water Multi-Color Coating is made by encapsulating colored sand with water-based emulsion to form gel particles, then spraying onto walls to form a coating film. Sand-in-Water Multi-Color Coating is a type of stone-effect coating with high emulsion content, textured surface with layered appearance, and high simulation accuracy.

Execution Standard

Execution Standard GB/T 9756-2018, GB 18582-2020; Common Packaging: 5L / 18L / 20kg / 25kg; Theoretical Paint Consumption: 8–10 ㎡/L/coat (dry film 30μm, actual consumption varies with substrate and application method).

Key Points of Construction

The base must be stable, even, dry, and clean, with wall moisture <10% and pH <10; new walls should be cured for more than 28 days; apply one coat of primer and two coats of finish; construction temperature ≥5℃ and relative humidity ≤85%; surface dry time 60 minutes at 25℃, with a recoat interval ≥2 hours.

PRODUCT INFORMATION

Product Overview

Good safety, high simulation, good crack resistance, long service life, good water resistance, good color retention

01

Product Overview

Modern Sand-in-Water Multi-Color Coating is made by encapsulating colored sand with water-based emulsion to form gel particles, then spraying onto walls to form a coating film. Sand-in-Water Multi-Color Coating is a type of stone-effect coating with high emulsion content, textured surface with layered appearance, and high simulation accuracy.

02

Applications

Widely applicable to concrete walls, metal panels, wood panels, gypsum products, plastics, glass, tiles, tiles, mosaics, and various substrates.

03

Composition

Emulsion, fillers, additives, and purified water.

04

Dilution

Stir thoroughly before use. Add a small amount of water for dilution if necessary.

05

Application Process

Item No.Construction ContentConstruction Instructions
1.Substrate Preparationa. Ensure the wall has sufficient curing time (more than 28 days) and is fully dry. b. The wall must be stable, flat, dry, clean, and free of floating dust and oil stains. c. Wall humidity must be less than 10%. Wall pH value must be less than 10. d. For walls with old coatings, test to confirm good adhesion; otherwise, remove the old coating.
2.Putty Application (2 coats)Apply putty evenly, smoothly, and densely. Each coat must be sanded flat. Start the next process after 7 days. Theoretical usage is 0.3-0.5 m2/kg per coat.
3.Primer Application (1-2 coats)Apply protective paper to door and window frames. Spray primer to prevent alkaline seepage from damaging natural stone coating. Theoretical usage is 7-9 m2/kg per coat.
06

Additional Information

5.Taping Line TapeTaping must start with vertical lines, then horizontal lines. At joints, nails can be used to fix the tape to avoid difficulty in locating the tape source after spraying.
6.Colored Primer ApplicationAfter the primer is fully dry, apply colored intermediate coat using spray gun or roller. Theoretical usage is 5-8 m2/kg per coat.
7.Main Coat Application (1-2 coats)Use a spray gun with approximately 4.0mm nozzle diameter to spray 1-2 coats. Theoretical usage is 1.5-3 m2/kg per coat.
8.Removing Line TapeRemove the tape immediately after spraying. Be careful during removal to avoid affecting the coating edge; pull upwards instead of forward.
9.Spraying Topcoat (1-2 coats)After the main coat is fully cured (24 hours), spray the dedicated transparent topcoat. Theoretical usage is 7-9 m2/kg per coat.

1 year. Ten

GB/T9755-2014 GB18582-2020

A project in the pipeline?

Tell us the substrate, area and schedule, and our engineers will come back within 48 hours with a coating system.

Get a coating proposal →