Applications
N. 10. This product is suitable for the treatment of indoor substrates such as cement mortar, concrete, gypsum board, brick walls, and wooden boards.
Water-resistant & moisture-proof · Good sandability · Odorless & eco-friendly
NO. 882 Execution Standard GB/T 9756-2018, GB 18582-2020; Common Packaging: 5L / 18L / 20kg / 25kg; Theoretical Paint Consumption: 8–10 ㎡/L/coat (dry film 30μm, actual consumption varies with substrate and application method).
The base must be stable, even, dry, and clean, with wall moisture <10% and pH <10; new walls should be cured for more than 28 days; apply one coat of primer and two coats of finish; construction temperature ≥5℃ and relative humidity ≤85%; surface dry time 60 minutes at 25℃, with a recoat interval ≥2 hours.
N. 1. Interior Wall Water-Resistant Putty
N. 10. This product is suitable for the treatment of indoor substrates such as cement mortar, concrete, gypsum board, brick walls, and wooden boards.
Adhesive, mineral fillers, and cellulose. Four. Mixing ratio and usage: add 30-50% water (by weight), stir into a uniform paste, let stand for 5 minutes, then stir slightly (1 minute) for construction. The mortar consistency should be adjusted to ensure smooth application.
25 kg/bag. This product adopts Modern Coatings eco-friendly technology, developed using low-odour eco-friendly raw materials. It has strong adhesion and good weather resistance. Its dense structure overcomes the shortcomings of traditional putty such as cracking, peeling, and odour. It can save topcoat usage and enhance film durability.
Good scraping application
10% pH value must be less than 10.
N. 1. New cement wall surface
N. 2. Curing time
N. 3. Must reach 28 days
N. 4. (Winter) or
N. 5. 14 days (
N. 6. Summer).
N. 7. . Cracks,
N. 8. board joints should be filled solidly
N. 9. and add mesh tape, apply putty after drying.
N. 10. Should be at 5℃ or above
N. 1. The thickness of each putty application should not exceed
1mm。
N. 2. Should not be exposed to rainwater
N. 3. Abrasion. Curing
N. 4. 5-7 days later, proceed
N. 5. Coatings application.
2-3 kg/m
N. 6. 2. Seven,
N. 7. Store at the location.
N. 8. Should be stored sealed
N. 9. Putty that has been mixed with water should be used within
N. 10. Used up within 2 hours.
N. 12 months
N. 10. Execution Standards
G/T298-2010
GB/T18582-2001
Putty Systems · A complete putty system from base coat to finish — water-resistant and crack-free. Used with our coatings it lifts wall flatness and durability.
Tell us the substrate, area and schedule, and our engineers will come back within 48 hours with a coating system.