Waterborne Coatings · Air Purification · Advanced Nanomaterials
HOTLINE 400-880-0351
Home / /Waterproofing & Auxiliaries /One-Component Engineering Waterproofing Slurry 25KG
PRODUCT DETAIL

One-Component Engineering Waterproofing Slurry 25KG

Good pressure resistance · Good bonding strength · Odorless & eco-friendly

One-Component Engineering Waterproofing Slurry 25KG NO. 871
Waterproofing & Auxiliaries / Waterproofing Slurries & Agents

One-Component Engineering Waterproofing Slurry 25KG

25KG / pail Good pressure resistanceGood bonding strengthOdorless & eco-friendly

N. 7. This product is a single-component general-purpose polymer cement waterproof slurry, utilizing Modern Coatings' low-odour waterproof technology, primarily composed of high-performance polymer emulsion with a certain proportion of cement

Execution Standard

Waterproofing Grout 25kg / 5kg; Penetrating Crystalline Nanomaterial Waterproofing Agent 4kg/bottle; Water-based Transparent Nanomaterial Waterproofing Agent 25kg; Putty Powder and Mortar 25kg/bag.

Key Points of Construction

The base must be solid, free of standing water and oil stains, and cracks must be repaired and reinforced beforehand. Apply the waterproof coating in 2-3 layers with crisscross directions, and add an additional layer at (yang-yin jiao). After construction, maintain for 7 days before conducting a water retention test.

PRODUCT INFORMATION

Product Overview

N. Good pressure resistance, good stability, good durability, good adhesion, low-odour eco-friendly, convenient construction.

01

Product Overview

N. 7. This product is a single-component general-purpose polymer cement waterproof slurry, utilizing Modern Coatings' low-odour waterproof technology, primarily composed of high-performance polymer emulsion with a certain proportion of cement

02

Key Features

N. 1. Good pressure resistance, capable of withstanding high static water pressure, suitable for negative water surface

N. 2. Good stability, resistant to erosion by carbonates and chloride ions

N. 3. Good durability, suitable for long-term submersion

N. Good adhesion allows immediate use of tiles on the surface.

N. Use adhesive to stick tiles.

N. 5. Low-odour and eco-friendly, suitable for use in fish ponds and swimming pools

N. 6. Easy to apply, and can be applied in wet areas

03

Applications

N. Suitable for waterproofing projects of concrete, brick walls, blocks, precast blocks, etc., such as subway stations, tunnels, basements, kitchens, bathrooms, pools, etc.

04

Application Process

N. The substrate should be hard, flat, dry, clean, and free of cracks, oil, and chemical substances such as release agents. If the surface has large areas of floating slurry or loose material, it should be ground and cleaned first.

05

Additional Information

3 minutes to a sediment-free gel-like body, then let stand

Stir again after 3-5 minutes

Mix for 10-20 seconds and it can be used. During use, intermittent stirring should be maintained to prevent sedimentation of the slurry

2. Brushing: Use a stiff bristle brush, roller, or spray gun to evenly apply the mixed slurry to a wet substrate. The thickness per layer is approximately 1mm, and for underground works, it is 1.5-2mm

Wait until the lower layer is half dry, just not sticky (usually requires

N. After 1-3 hours), apply the second layer. If the coating has fully cured or exceeds

N. 24 hours, recoat when applying the upper layer.

N. New Sprinkling Water.

N. 2-3 days, for long-term

N. Water pools should be left empty before filling.

N. Fill with water only after 15 days.

N. 5. Water Retention Test: After the curing period, conduct the water retention test (it can be delayed appropriately if the temperature is low or ventilation is poor); the water retention time should be more than 24 hours, and the next step of construction can only proceed after confirming there is no leakage.

N. =1:1 (weight ratio)

N. 1. 2 (Single application, dry film thickness

N. Store in a cool, dry place between 0-35℃.

A project in the pipeline?

Tell us the substrate, area and schedule, and our engineers will come back within 48 hours with a coating system.

Get a coating proposal →