Waterborne Coatings · Air Purification · Advanced Nanomaterials
HOTLINE 400-880-0351
Home / /Wood Coatings /HANZHI Semi-Matte Water-based High-Hardness Clear Topcoat · 3KG
PRODUCT DETAIL

HANZHI Semi-Matte Water-based High-Hardness Clear Topcoat · 3KG

High hardness · Abrasion & scratch resistant · High clarity

HANZHI Semi-Matte Water-based High-Hardness Clear Topcoat · 3KG NO. 1385
Wood Coatings / HANZHI · Water-based Wood Coatings

HANZHI Semi-Matte Water-based High-Hardness Clear Topcoat · 3KG

3KG / pail High hardnessAbrasion & scratch resistantHigh clarity

N. 2. This product is suitable for coating the surfaces of wooden materials in homes, hotels, offices, and other places, such as doors, wardrobes, wooden walls, handrails, and other various panels.

Execution Standard

Han series common packaging: 3kg; pine wood and PU series supplied according to sample; gloss options include high gloss / semi-matte / matte.

Key Points of Construction

The moisture content of the substrate is recommended to be controlled at 8%-12%, and the construction environment humidity should be below 75%; apply thin coats multiple times, and thoroughly sand and dust between layers; avoid construction in low-temperature and high-humidity environments to prevent the paint film from turning white.

PRODUCT INFORMATION

Product Overview

Low-odour eco-friendly, safe and non-flammable, high hardness, good water resistance, high transparency, wear-resistant and scratch-resistant

01

Product Overview

N. 2. This product is suitable for coating the surfaces of wooden materials in homes, hotels, offices, and other places, such as doors, wardrobes, wooden walls, handrails, and other various panels.

N. 3. Especially suitable for table top panels

02

Composition

N. 4. Acrylic emulsion, fillers, additives, distilled water, etc.

03

Additional Information

N. 5. On-site application for exterior wooden products

N. 6. Spray application. 2. Suitable for

N. 7. Factories coating children's toys for export to Europe and the United States

N. 8. Production line coating

N. 9. Air spray gun application, each coat

N. 10. 1-2 'cross' marks

N. 11. 6 hours / 25℃

N. 12. ≥2 hours / 25℃

N. 13. When temperatures are low or during the rainy season, the recoat interval should be appropriately extended.

N. 14. Recommended for thin-layer, multiple coats application

N. 15. Between coats, use

400—

N. 16. 600# sandpaper for sanding

Sand flat.

6 days / 25℃; when in low temperatures or rainy seasons, the curing time should be appropriately extended.

-15% dilution with clean water

. 2. Can

Add an appropriate amount (

≤10%

) water-based color paste

Use. 3. Please stir thoroughly before use.

Coverage: 1.4-6 m²/L

/coats (based on dry film thickness

20 micrometers

) 2. Due to construction

Surface condition, dilution ratio, and construction method differences will result in varying actual paint consumption.

GB/T 23999-2009

. 10. Effective storage period

2 years.

A project in the pipeline?

Tell us the substrate, area and schedule, and our engineers will come back within 48 hours with a coating system.

Get a coating proposal →