Product Overview
N. 3. This product is made using Modern Coatings Technology, effectively preventing hollowing, cracking, or falling off of panels during adhesion.
Strong adhesive strength · Good flexibility · Good penetration
NO. 885 N. 3. This product is made using Modern Coatings Technology, effectively preventing hollowing, cracking, or falling off of panels during adhesion.
Execution Standard GB/T 9756-2018, GB 18582-2020; Common Packaging: 5L / 18L / 20kg / 25kg; Theoretical Paint Consumption: 8–10 ㎡/L/coat (dry film 30μm, actual consumption varies with substrate and application method).
The base must be stable, even, dry, and clean, with wall moisture <10% and pH <10; new walls should be cured for more than 28 days; apply one coat of primer and two coats of finish; construction temperature ≥5℃ and relative humidity ≤85%; surface dry time 60 minutes at 25℃, with a recoat interval ≥2 hours.
N. 10. Easy to apply with adhesive, strong adhesion, good flexibility, improves work efficiency, good penetration, penetrates deeply into the substrate, moderate elasticity.
N. 3. This product is made using Modern Coatings Technology, effectively preventing hollowing, cracking, or falling off of panels during adhesion.
N. 2. Easy to apply with adhesive, directly brush on the backside. Strong adhesion, tiles won't fall off. Good flexibility, prevents cracks from thermal expansion and contraction. Improves work efficiency, can be brushed and tiled immediately. Good penetration, penetrates deeply into the substrate. Moderate elasticity, resists cracks from cement shrinkage.
N. 4. Suitable for adhering tiles, polished tiles, non-slip tiles, mosaic, marble, and natural stone panels.
N. 5. The backside of tiles and other panels should be flat, dry, clean, and free from oils, mortar, and other contaminants.
N. 1. 12-15 M2/KG/Coat. 2. Due to differences in surface conditions and application methods, actual consumption may vary.
Construction Accessories · Bonding agents, tile adhesives, wallpaper primers and the standard color card — the final link in a complete application system.
Tell us the substrate, area and schedule, and our engineers will come back within 48 hours with a coating system.