Waterborne Coatings · Air Purification · Advanced Nanomaterials
HOTLINE 400-880-0351
Home / /Architectural Coatings /Water-based Clear Premium Bonding Agent 15KG
PRODUCT DETAIL

Water-based Clear Premium Bonding Agent 15KG

Odorless & eco-friendly · Strong adhesion · High coverage

Water-based Clear Premium Bonding Agent 15KG NO. 890
Architectural Coatings / Construction Accessories

Water-based Clear Premium Bonding Agent 15KG

15KG / pail Odorless & eco-friendlyStrong adhesionHigh coverage

This product adopts Modern Coatings eco-friendly net-odour technology, selects net-odour eco-friendly raw materials, with low odour, stable formula, and good sealing property and adhesion.

Execution Standard

Execution Standard GB/T 9756-2018, GB 18582-2020; Common Packaging: 5L / 18L / 20kg / 25kg; Theoretical Paint Consumption: 8–10 ㎡/L/coat (dry film 30μm, actual consumption varies with substrate and application method).

Key Points of Construction

The base must be stable, even, dry, and clean, with wall moisture <10% and pH <10; new walls should be cured for more than 28 days; apply one coat of primer and two coats of finish; construction temperature ≥5℃ and relative humidity ≤85%; surface dry time 60 minutes at 25℃, with a recoat interval ≥2 hours.

PRODUCT INFORMATION

Product Overview

N. 8. Eco-friendly low-odour, strong adhesion, good bonding, high coverage rate, cost-effective and practical.

01

Product Overview

This product adopts Modern Coatings eco-friendly net-odour technology, selects net-odour eco-friendly raw materials, with low odour, stable formula, and good sealing property and adhesion.

02

Applications

N. 7. This product serves as a primer for wall and floor absorption bases (such as concrete, cement mortar, gypsum board, plywood, etc.), sealing the capillary pores and gaps of the base, reducing the water absorption rate of porous bases; meanwhile, enhancing the interface adhesion of the base, acting as a bonding bridge.

N. 9. Four. Surface Preparation: The substrate should be hard, flat, dry, clean, and free of cracks, oil, release agents, etc. If the surface has large areas of flaking or looseness, it should be ground and cleaned first.

A project in the pipeline?

Tell us the substrate, area and schedule, and our engineers will come back within 48 hours with a coating system.

Get a coating proposal →