14-28
N. 10. Days, masonry curing for 5-7 days)
3 minutes to a sediment-free gel-like body, then let stand
Stir again after 3-5 minutes
Mix for 10-20 seconds and it can be used. During use, intermittent stirring should be maintained to prevent sedimentation of the slurry
2. Brushing: Use a stiff bristle brush, roller, or spray gun to evenly apply the mixed slurry to a wet substrate. The thickness per layer is approximately 1mm, and for underground works, it is 1.5-2mm
Wait until the lower layer is half dry, just not sticky (usually requires
1-3 hours)
Apply the second layer
If the coating has fully cured or
exceeds 24
hours, then when applying the upper layer, it must be recoated
N. New Sprinkling Water.
N. 2-3 days, for long-term
N. Water tanks that hold water should be left empty for 15 days before being filled with water.
N. 5. Water Retention Test: After the curing period, conduct the water retention test (it can be delayed appropriately if the temperature is low or ventilation is poor); the water retention time should be more than 24 hours, and the next step of construction can only proceed after confirming there is no leakage.
N. 2 (with single application, dry film thickness of 1.0mm, the usage refers to the total amount of powder and liquid).
N. Store in a cool, dry place between 0-35℃.