Waterborne Coatings · Air Purification · Advanced Nanomaterials
HOTLINE 400-880-0351
Home / /Architectural Coatings /HANLU Odorless Water-based Sealing Varnish (Wallpaper Primer) · 5L
PRODUCT DETAIL

HANLU Odorless Water-based Sealing Varnish (Wallpaper Primer) · 5L

Odorless & eco-friendly · Alkali-resistant · Water-resistant & anti-mildew

HANLU Odorless Water-based Sealing Varnish (Wallpaper Primer) · 5L NO. 859
Architectural Coatings / Construction Accessories

HANLU Odorless Water-based Sealing Varnish (Wallpaper Primer) · 5L

5L / pail Odorless & eco-friendlyAlkali-resistantWater-resistant & anti-mildew

N. This product (Wallpaper Treasure)

Execution Standard

Execution Standard GB/T 9756-2018, GB 18582-2020; Common Packaging: 5L / 18L / 20kg / 25kg; Theoretical Paint Consumption: 8–10 ㎡/L/coat (dry film 30μm, actual consumption varies with substrate and application method).

Key Points of Construction

The base must be stable, even, dry, and clean, with wall moisture <10% and pH <10; new walls should be cured for more than 28 days; apply one coat of primer and two coats of finish; construction temperature ≥5℃ and relative humidity ≤85%; surface dry time 60 minutes at 25℃, with a recoat interval ≥2 hours.

PRODUCT INFORMATION

Product Overview

N. Low odour, low-odour and eco-friendly, good alkali resistance, good penetration, good sealing, water-resistant and mildew-proof

01

Product Overview

N. This product (Wallpaper Treasure)

Complies with strict net-odour eco-friendly paint standards, selects net-odour eco-friendly raw materials, with low odour, safe and healthy, possessing low odour, low VOC advantages.

N. 1. After applying this product, it can harden the wall, seal the substrate, and form a dense protective film, effectively preventing moisture and alkaline substances from leaking out, avoiding wallpaper yellowing and discoloration, thus extending the wallpaper's lifespan and keeping it vibrant as new. It is an eco-friendly, new wall treatment material used to replace traditional clear varnish.

02

Applications

N. 2. Surfaces of boards and other substrates. III. Surface Requirements for Application 1. Before coating, the wall must be stable, flat, dry, clean, and free of dust and oil stains.

03

Safety & Storage

N. When applying and maintaining, ensure good ventilation and avoid water exposure.

04

Additional Information

N. 3. Humidity must be less than 10%. High humidity will affect the adhesion of the coating film, causing blistering and mottling.

N. 4. Leaching of alkaline substances or salts

N. 5. will cause blistering and mottling of the coating film

N. 6. (Concrete and cement mortar are both alkaline).

N. 7. a. Ensure the wall has sufficient curing time (

N. 8. more than 28 days

N. 9. ), and be fully dry.

N. 1. b. Remove mortar residue and loose material from the surface. Fill holes and cracks with putty to make them flat and ensure thorough drying.

N. 2. c. Use a neutral cleaner or solvent to remove oil stains, then rinse with clean water and dry thoroughly.

N. 3. a. Inspect the wall condition and refer to the new wall treatment method based on different surface defects.

N. 4. b. Remove oil stains and floating dust from the wall.

N. 5. c. Use an anti-mold solution to thoroughly remove mold or moss, then rinse with clean water and dry thoroughly.

N. 6. a. If shrinkage or cracks appear on the wall, use putty to repair and level the surface, then ensure thorough drying.

N. 7. b. If the original coating has good adhesion, clean it thoroughly and apply directly.

N. 8. c. If the old coating film has bubbling, peeling, or cracking, remove it thoroughly, repair and sand it, then clean it thoroughly.

N. 10. Dilute with 20% water.

60 minutes / 25°C, hard dry

120 minutes / 25°C.

≥2 hours / 25°C. At low temperatures and during the rainy season, the recoat interval should be appropriately extended.

1.10-12

m²/l

/coats (based on dry film thickness

30 micrometers

) 2. Due to construction

Surface condition, dilution ratio, and construction method differences will result in varying actual paint consumption.

N. 7. Store at the location.

2 years. Ten /think

GB/T9756-2018 GB18582-2020

A project in the pipeline?

Tell us the substrate, area and schedule, and our engineers will come back within 48 hours with a coating system.

Get a coating proposal →